Logistics · Data Engineering

Business-critical dashboards moved platforms with reporting unbroken

Power BI dashboards rebuilt in Apache Superset and the BI platform moved from EC2 to Amazon EKS, with access controls and metadata intact.

Business reporting carried on through the migration, and the BI platform now runs containerised on Kubernetes, with access control and metadata preserved.

The operating problem

A BI platform to move without dropping a single report

The organisation needed its business-critical Power BI dashboards migrated to Apache Superset, and its infrastructure moved from AWS EC2 to Amazon EKS.

Dashboards had to stay consistent, user access controls and metadata intact, Databricks connectivity unbroken, and downtime minimal through the production transition.

What Ganit engineered

Dashboards and infrastructure migrated together, then cut over in parallel

Dashboards were recreated in Apache Superset against Databricks SQL Warehouse, with metadata and role-based access carried across environments. The platform itself moved to containers on Amazon EKS, with a DNS cutover and automated monitoring.

Apache Superset on Amazon EKS, reading from Databricks SQL Warehouse.

  1. Dashboard Migration

    Power BI dashboards recreated in Apache Superset, kept consistent with the originals.

  2. Access and Metadata

    RBAC controls and metadata preserved, with Databricks SQL Warehouse connectivity across environments.

  3. Kubernetes Deployment

    The BI platform containerised and moved from EC2 to Amazon EKS, with automated monitoring.

  4. Controlled Cutover

    Parallel validation and UAT before a managed production switch and DNS cutover.

How the work changed

From dashboards on EC2 to a containerised BI platform

Current stateThe gapDesired stateOn Superset and EKS
Business-critical dashboards built in Power BI.The same dashboards recreated in Apache Superset.
The BI platform ran on AWS EC2.Containerised deployment on Amazon EKS.
Production cutover was a risk to reporting.Parallel validation and UAT before a controlled cutover.

What closed the gapDashboard Migration · Access and Metadata · Kubernetes Deployment · Controlled Cutover

Next story · RetailRetail reports in seconds, not days~90%less manual reporting time, days cut to seconds