Logistics · Data Engineering
Eight global data centres, one near-real-time logistics estate
SQL, Oracle and Aurora MySQL across eight global data centres, brought into one current foundation for cross-functional analytics.
- lower cost
- 71.05%
- higher job efficiency
- 38.4%
- lower DMS cost
- 36.66%
- lower EMR cost
- ~15.34%
The operating problem
Eight data centres, three database systems, and no single truth
Data sat in eight geographically distributed data centres across MS SQL, Oracle and Aurora MySQL. Reporting was siloed and visibility across operations was limited.
The set-up was a costly, legacy on-premise architecture, short on scalability and governance. Long processing cycles delayed reporting and made cross-functional, real-time analytics hard.
What Ganit engineered
A central S3 lake and Redshift warehouse, fed in near real time
PySpark Streaming and DMS change data capture feed a centralised S3 data lake and Redshift warehouse. Step Functions and EventBridge automate the pipelines, and reporting workloads moved from on-premise stored procedures to Redshift.
AWS DMS, Amazon S3, Amazon EMR, Amazon Redshift, AWS Step Functions, Amazon EventBridge, AWS Lambda and Amazon SNS.
Near Real-time Lake
PySpark Streaming and DMS change data capture, with sub-minute capture (~1 min).
Central Warehouse
An S3 data lake and Redshift warehouse that unify data from all eight data centres.
Automated Pipelines
Step Functions and EventBridge remove manual effort and reduce operating cost.
Cost Optimisation
Autoscaling on DMS and Spot instances on EMR lower the cost of running the estate.
How the work changed
From siloed regional data to one near-real-time estate
| Current state | The gap | Desired state |
|---|---|---|
| Siloed regional data and limited visibility. | A single source of truth across all eight data centres. | |
| High-cost, legacy on-premise architecture. | A scalable, automated AWS estate at lower cost. | |
| Long processing cycles delayed reporting. | Sub-minute data capture for near real-time reporting. |
What closed the gapNear Real-time Lake · Central Warehouse · Automated Pipelines · Cost Optimisation