The operating problem

Eight data centres, three database systems, and no single truth

Data sat in eight geographically distributed data centres across MS SQL, Oracle and Aurora MySQL. Reporting was siloed and visibility across operations was limited.

The set-up was a costly, legacy on-premise architecture, short on scalability and governance. Long processing cycles delayed reporting and made cross-functional, real-time analytics hard.

What Ganit engineered

A central S3 lake and Redshift warehouse, fed in near real time

PySpark Streaming and DMS change data capture feed a centralised S3 data lake and Redshift warehouse. Step Functions and EventBridge automate the pipelines, and reporting workloads moved from on-premise stored procedures to Redshift.

AWS DMS, Amazon S3, Amazon EMR, Amazon Redshift, AWS Step Functions, Amazon EventBridge, AWS Lambda and Amazon SNS.

  1. Near Real-time Lake

    PySpark Streaming and DMS change data capture, with sub-minute capture (~1 min).

  2. Central Warehouse

    An S3 data lake and Redshift warehouse that unify data from all eight data centres.

  3. Automated Pipelines

    Step Functions and EventBridge remove manual effort and reduce operating cost.

  4. Cost Optimisation

    Autoscaling on DMS and Spot instances on EMR lower the cost of running the estate.

How the work changed

From siloed regional data to one near-real-time estate

Current stateThe gapDesired state
Siloed regional data and limited visibility.A single source of truth across all eight data centres.
High-cost, legacy on-premise architecture.A scalable, automated AWS estate at lower cost.
Long processing cycles delayed reporting.Sub-minute data capture for near real-time reporting.

What closed the gapNear Real-time Lake · Central Warehouse · Automated Pipelines · Cost Optimisation