Manufacturing · AI Engineering
Dispatch allocation in under a minute
Handler-device allocation, reframed from operator memory into an optimisation problem with business constraints and measurable trade-offs.
- allocation, from ~10 minutes
- <1 min
- throughput
- +2%
- yield
- +1%
The operating problem
Operator experience set the allocation, one lot at a time
Devices were assigned to test handlers by hand, on operator experience and machine availability. Resource use was inefficient, decisions were inconsistent and throughput suffered.
The business needed a scheduler that could weigh several operational constraints at once.
What Ganit engineered
An optimisation engine that assigns the right handler
Ganit built an engine that assigns handlers to devices within production constraints and machine availability. It is integrated with manufacturing systems, with minimal disruption to existing workflows.
Intelligent Scheduling Engine
Automatically assigns the right handlers to devices from production constraints and machine availability.
Production Integration
Connects AI scheduling to manufacturing systems to lift throughput, cut allocation time and protect yield.